Westwood Baptist Church

Westwood Baptist Church is a project that was completed in Alabaster, Alabama. It is a very large church and adjacent parking that took careful site and plan layout before development due to the location being a Greenfield site. Because of the lack of development in the area, it took careful coordination with the City of…

UAB Heritage Hall

UAB’s Heritage Hall is a 5-story, 92,000 square foot facility that houses the School of Social and Behavioral Sciences. It is located on the northwest corner of Campus Green along University Boulevard in the heart of the UAB Campus. Construction was completed in January of 2008. Location: Birmingham, Alabama Services Provided: Civil Engineering Land Surveying

UAB Blazer Hall

The University of Alabama at Birmingham masterplan indicated the need for a campus green area that would become a focal point of the campus and a place for students to gather. This campus green area encompassed five projects. Camp Hall Dormitory Academic Building UAB Recreation Center UAB Campus Green UAB Dining facility Significant infrastructure and…

Carver High School

Carver High School is a $50 million dollar high school on approximately 50 acres in the northern area of Birmingham. The scope of work included all surveying and design tasks associated with the development and construction of this new facility including football and baseball fields. Location: Birmingham, Alabama Services Provided: Topographic Survey Civil/Site Engineering Design…

UAB Campus Green Area

The University of Alabama at Birmingham masterplan indicated the need for a campus green area that would become a focal point of the campus and a place for students to gather. This campus green area encompassed five projects. Camp Hall Dormitory Academic Building UAB Recreation Center UAB Campus Green UAB Dining Facility Significant infrastructure and…

Barber Motorsports Parkway

The Barber Motorsports Park is a world class racing facility located in Birmingham, Alabama. During construction of the facility, Schoel was called in to assist in preventing sediment from leaving the site and eventually getting into the Cahaba River. Schoel designed and oversaw the implementation of an innovative pumping and filtration system that dispersed the…